Abstract

The article is devoted to the pile foundations erection problems in the Republic of Belarus. The main attention is paid to defects, which occur during the bored piles installation, their reasons indications, and to the pile integrity testing main nondestructive methods possibilities. The article notes these methods technical regulation gaps, and their elimination need for effective implementation in the practice of design and construction in our country.

Author Biographies

Alexander Nikolaevich Nevejkov, State Enterprise "Institute "Belzheldorproject""

Ph.D in Engineering, Leading Engineer of the Department of Artificial Structures SE "Institute "Belzheldorproekt"", Minsk, Republic of Belarus.

Vladimir Nikolaevich Dedok, Brest State Technical University

Senior Lecturer of the Department of Geotechnics and Transport Communications of the Brest State Technical University, Brest, Republic of Belarus.

Published

2023-03-24

How to Cite

(1)
Nevejkov, A. N.; Dedok, V. N. THE PILE INTEGRITY TESTING TECHNICAL LEGISLATION METHODS NEED IN THE REPUBLIC OF BELARUS. Вестник БрГТУ 2023, 50-55.