METHODOLOGY FOR THE DEVELOPMENT OF AN INTEGRATED INFORMATION AND CONSTRUCTION PROJECT USING BIM TECHNOLOGIES
DOI:
https://doi.org/10.36773/1818-1112-2024-133-1-85-94Keywords:
BIM technologies, water supply and sewerage networks, construction project,, life cycle, flowchart, methodology, Building Information ModelAbstract
The analysis of BIM technology in the implementation of a construction project on engineering networks of water supply and sewerage has been carried out. The roles of the participants in the design process are defined. Maps of basic processes (scenarios) have been developed: model development; verification and evaluation of technical solutions; spatial interdisciplinary coordination and collision detection (3D-coordination). As the main protocol of the collaboration process throughout the life cycle of the project, the documentation "BIM Project Implementation Plan" is proposed, which defines the roles and functions of the participants. It is shown that the constructed flowcharts represent a methodology for the development of an integrated information and construction project using BIM technologies and include sequentially the stages of initiation, planning, organization, execution, control and closure of a construction project.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Brest State Technical University
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
The work is provided under the terms of Creative Commons public license Attribution-NonCommercial 4.0 International (CC BY-NC 4.0). This license allows an unlimited number of persons to reproduce and share the Licensed Material in all media and formats. Any use of the Licensed Material shall contain an identification of its Creator(s) and must be for non-commercial purposes only. Users may not prevent other individuals from taking any actions allowed by the license.