KOCHURKO, A. N.; SRYVKINA, L. G. METHOD FOR SELECTING A COST-EFFECTIVE OPTION OF THE SEQUENCE OF CONSTRUCTION OF BUILDINGS AND STRUCTURES IN A COMPLEX. Vestnik of Brest State Technical University, [S. l.], n. 3(126), p. 103–107, 2021. DOI: 10.36773/1818-1112-2021-126-3-103-107. Disponível em: https://journal.bstu.by/index.php/bstu_herald/article/view/642. Acesso em: 14 sep. 2026.