[1]
Kochurko, A.N. and Sryvkina, L.G. 2021. METHOD FOR SELECTING A COST-EFFECTIVE OPTION OF THE SEQUENCE OF CONSTRUCTION OF BUILDINGS AND STRUCTURES IN A COMPLEX. Vestnik of Brest State Technical University. 3(126) (Dec. 2021), 103–107. DOI:https://doi.org/10.36773/1818-1112-2021-126-3-103-107.